Part I · The Plants

Electrical Plant

Two to four diesel generators feed a main switchboard, which feeds every motor, heater, lamp, and control signal on the ship. An emergency generator and a battery bank carry the services that must survive losing the main board.

Lessons and simulators

Lessons teach one thing step by step. Simulators are free play: best after the lesson.

LessonBus Tie and Rack-Out BreakersWhat a bus tie is for, every part inside an air circuit breaker, how it closes and trips, racking it out safely, and finding out why it won't close.LessonSynchronizing and Load SharingPut No. 2 generator on the board: match voltage and frequency, close just before 12 on the synchroscope, share the kW with the governors and the kVAR with the AVRs, fix a backward droop CT, and sort six sets that won’t share.LessonGround Lamps and the Ground HuntRead the three ground lamps and the insulation monitor, name the island a ground is on, half-split the board down to a wet deck light, and find a ground on a feeder that can’t be dropped with the leakage clamp.LessonThe Emergency Generator ChainWatch the undervoltage relay open the tie, start the 250 kW set and close its breaker inside 45 seconds; sort the emergency board’s loads; check cranking volts; run the real test with the tie open and the load on; and name six quiet failures.LessonShore PowerProve rotation and fix it at the shore end, judge four berths’ volts and hertz, fit the load under a 400 A pier breaker, change over through a blackout, see why a ground trips on shore power, and find a warm lug.LessonProtective Relays: Read the FlagWhat each of the five generator relays watches; a reverse power trip after a slow close; overcurrent that rides through a motor start; the AVR’s relays against the governor’s; differential and its zone; a multifunction relay’s event log; and six trips to sort.LessonThe Main Board One-LineWhat each feeder on the main board protects, what else just lost power, inside a feeder cubicle, a crane feeder trip walked down to a wet junction box, why an open tie proves nothing, and six calls.LessonPreferential Trip and Load SheddingSort the feeders into stages and the never-shed list, watch a set trip and the board shed load to save the last set, the blackout without it, capacity before putting the load back, and why a set over its share can shed the galley.WorksheetTen QuestionsWorksheet. Match the ten questions to the sheets that answer them, answer all ten for M/V Hawsepiper without a drawing, find the one no sheet answers, and see which sheets to walk again. Then keep your own ten at the front of your turnover notes.LessonThe Synchronous Machine: Two Sets of RulesThe same governor and AVR knobs on a set alone and on a set paralleled. The helper who raised the voltage, the set that motored, and six which-rules calls.LessonStored Energy and Arc Flash: Where It HidesFour places energy stays after the breaker opens: an ACB’s closing spring, a drive’s DC bus, a pump turned by back-flow, a battery bank. Then the arc-flash label on the main board.LessonReading the Switchboard Like a StoryFive meters on each generator panel and the stories they tell: equal kW with unequal amps, unequal kW at the right frequency, a plant near its limit, poor power factor, low volts on every set.LessonShaft Generators: The Engine Doesn’t Care About 60 HzA sister ship with a shaft generator: slow the engine and watch the converter hold 60 Hz, set the condenser’s AVR, short a reefer feeder, then change over to the diesels before the pilot.LessonLighting: Ballasts, LED Drivers and Wet FittingsInside a fluorescent, an LED and an incandescent fitting and which part fails; four purifier room fluorescents; two dead LED floods on the bench; 120 LED drivers that look like a ground; four wet deck floods.LessonRepair a Fixture; GFCI CircuitsThe accommodation ladder light: prove it dead at the fitting (it has two feeds), find how the water got in, ohm it to hull before it goes back on. Then how a GFCI decides, and the one that won’t stay in.LessonHow Distribution BreaksPart 3 in one sitting: eight distribution symptoms sorted to their first check, then three walked on M/V Hawsepiper: a trip with nothing changed, a trip every start, and lights that dim and stay dim.LessonReefer Receptacles and the Monitoring SystemThe ship’s side of the reefers: the feeder to forty receptacles, the load on loading day, plugging in and out without burning pins, a rain ground found receptacle by receptacle, and the office screen read right.LessonRadio Battery: The Load Test and the ChangeHawsepiper’s GMDSS reserve on load with the bridge: open BDB-10, log an hour against last time, confirm it charges. Then a bank that falls faster, a weak block, and the change like for like.LessonThe Ungrounded System: The Ground That Waited a WeekWhy Hawsepiper’s 440 V has no link to the hull: the first ground trips nothing, moves the hull and not the phases, and waits. Then two grounds make a short.LessonAC and Three-Phase: What the Meter Is Telling YouDG2 at 59.3 Hz is an engine running slow. RMS and peak, true-RMS against average-responding on a UPS feed and a drive output, the voltmeter selector, and wye and delta windings.LessonThe Alternator in One Line: Two Loops, Three Machines and a BoxDG3 opened up: the power path from the PMG to the bus, the AVR’s loop working on a load step, the maker’s AVR sheet read part by part, a day-one walk round, and why you never megger through the AVR.LessonPlant Tour: The Electrical PlantWalk Hawsepiper’s electrical plant stop by stop on one drawing of the engine room and the accommodation above it, from the emergency generator to the shore connection: what to look at, what normal reads, a call at each stop; then six sets of readings.The shipOne-Line DiagramA ship's distribution as a one-line diagram: open any breaker and see what goes dead, trace a user back to its source, and name the breaker from the symptoms.Simulator · free playParallel the GeneratorsBring a ship's second diesel generator onto the board: match voltage, watch the synchroscope, close the breaker and share the load.Simulator · free playGround HuntRead the ground lamps and insulation monitor on an ungrounded ship's system, hunt a ground breaker by breaker, and tell a ground from a short or an open.Simulator · free playBlackout DrillOverload a generator and watch preferential trip and the standby start; black out the ship and follow the emergency generator, bus tie and sequential restart against the 45-second clock.Simulator · free playShore PowerTake the ship onto shore power: check voltage, frequency and rotation, cut the load to what the shore breaker can carry, transfer, and recognize the expected ground.

What kills it

Normal numbers

Maker’s values override these.

PointTypical
Bus voltage440–450 V (690 V on larger plants); limits +6 / −10 %
Frequency60 Hz (50 Hz on some ships); held within ±0.5 Hz
Generator load at sea50–85 % of rated kW; PMS starts standby above 85–90 %
Generator minimum load on HFOabout 45–50 %; start, stop, and idle on MDO
Warm-up before connecting3–5 min; jacket water about 60 °C
Power factor0.7–0.9 lagging; alternator rated at 0.8
Reverse power trip5–15 % of rated kW, delayed a few seconds
Overcurrent trip110–125 % delayed; instantaneous on short circuit
Under-frequency / under-voltage trip90–95 % / 60–80 % of nominal, delayed
Insulation resistance1 MΩ floor; healthy reads tens of MΩ
Megger test voltage500 V DC on 440 V gear; 1000 V on 690 V; 250 V on 220 V
Battery float, lead-acid / NiCd2.20–2.30 / 1.40–1.45 V per cell
Emergency generatoron the board within 45 s; 18 h fuel; a small fraction of one main set's kW

The tour

The plant, stop by stop, as the book walks it.

Reading the gauges

Each one is a set of readings. Decide what they mean and what you’d check first, then look.

Symptoms

SymptomCheck firstLikely causesAction
Ground lamp dark on one phase; IR alarmWhich bus — 440 or 220 V; what changedWet deck fitting, galley gear, floodlightIsolate feeders in turn (Stop 6)
Generator trips, reverse power flagThe engine — fuel, governorFuel starvation, governor failure, unloaded too farFix the engine before re-paralleling
Generator trips, overcurrent delayedkW before the trip; what startedHeavy consumer, standby not started, PMS in manualShed, start standby, re-parallel
Generator trips, overcurrent instantaneousWhich feeder breakers also trippedShort circuit on a feeder or busIsolate the fault before closing anything
BlackoutEmergency board live? Standby started?Last set tripped, standby not ready, bus faultScenario: blackout
Frequency low, lights dim, no trip yetGenerator kWOverload approachingStart standby now; shed
Voltage swinging, or over-voltage tripWhich set — double voltmeterAVR, sensing fuse, replacement AVR not settledStandby on; run that set only in parallel
Two sets trip within a minute, same alarmWhat they shareOil-mist detector panel, control supply, PLCThird set on; isolate the shared device
Start fail; engine fired or crankedRpm signal; pinion actionSpeed pickup, air start solenoid, starter air valveFix; drop set in standby order
Prelube low-pressure alarm after shutdownBearing return sight glass; pipe warmPrelube pump air-boundBleed at discharge, or off 5–10 min then AUTO
Auto-sync won't close the breakerIncoming Hz and voltageSync or governor trim faultBring it slightly fast by hand, back to auto
Preferential trip as a set is taken offAuto or manual unloadRamp-down fault, PF settings mismatchedUnload by hand, open breaker, stop locally
Motor hums, won't startAmps on three phasesLost phase — fuse, terminal, contactIsolate; find the open phase
24 V bus low, alarm panel dimCharger outputCharger failed, AC fuse, bank sulfatedRestore charger; load test the bank

Scenarios

Work out what you’d do, then open it.

blackout, standby recovers the bus

At sea on one set. It trips, the plant goes dark, and the standby starts and closes on the dead bus. The main engine has stopped. What comes back on its own, what doesn't, and what do you do first?

Sequential restart brings back only vital machinery: engine room fans, fuel, seawater, LT and HT, main and turbo LO, stern tube LO, boiler feed. Left for you: working air compressor, air conditioning and provisions refrigeration, auxiliary boiler, galley, incinerator, some fans — keep that list posted in the ECR. Report to the bridge and the Chief. Main engine: telegraph to stop, ECR control, confirm LO, HT, and cylinder lube, reset shutdowns, restart at dead slow, hand back. Bring a second set online and check the one that recovered the bus before heavy loads go back. Forget the air compressor and control air and start air bleed down within the hour — the engine you just restarted needs both.

both standbys fail, emergency generator on the emergency board

Blackout; neither standby set starts. The emergency generator is carrying the emergency board. How do you get a main set on?

Only sets whose control panels and prelube pumps are fed from the emergency board can start — know which on your ship. Emergency air receiver up, with the emergency compressor if needed. Start the MDO flushing pump to feed that set by head. Local, prelube confirmed, start, and close on the dead main bus at nominal voltage and frequency; it carries limited load until the main fuel pumps run. Watch the emergency generator's kW throughout. If the interconnector must back-feed the main board, shed every non-vital load first.

two sets trip a minute apart

Two sets on the bus. An oil-mist alarm trips one; a minute later the second trips on the same alarm. A standby starts and just catches the bus. What failed, and what now?

Two crankcases failing within a minute is unlikely; one detector panel serving both is likely. Get a third set ready, then check the tripped engines locally — crankcase doors, smell, LO pressure — before restarting one. Isolate the faulty detector head per the maker and clean or replace it; until then, keep a set in reserve. When a fault spreads to a second identical machine, look first at what they share.

find the ground

Morning watch after a night of rain. The 440 V ground lamps show one phase dark; the monitor reads 15 kΩ. Where do you start?

Rain says deck. Open the deck lighting feeder; if the lamps even up, it is a floodlight with water in it, found breaker by breaker at its panel. If not: deck receptacles, windlass and winch starters, deck crane; then galley, laundry, heaters. A partial recovery means more than one ground. The lamps say which phase; the megger on the isolated circuit says which cable.

Dependencies

Needs
  • Starting air or batteries for the first set; the emergency board, emergency air compressor, and ESB-fed prelube and control power are the dead-ship path
  • Fuel — MDO by gravity or flushing pump for a dead-ship start; HFO heating once running
  • LT and HT cooling, and jacket water preheat for standby sets
  • Lube oil — prelube before start
  • Control power — shared by stop solenoids, PMS, detector panels
Feeds
  • Everything with a motor, heater, lamp, or control signal — every plant in this book
  • Steering gear — two feeds, one from the emergency board
  • Main engine auxiliaries — it stops when they do
  • Compressed air — compressors need a manual restart after a blackout
  • Alarm, automation, navigation, and communication through the chargers and UPS

Draft: this page is drawn from the book manuscript and is still being checked.