The Ungrounded System: The Ground That Waited a Week
On shore a phase that touches ground is a short and a breaker opens. On the ship nothing connects the system to the hull, so the first ground has nowhere to go and everything keeps running. The price: you can’t see it without instruments, and the second one is a short.