Preferential trip: when the running set is overloaded, non-essential feeders (galley, A/C, then reefers or deck gear) are tripped in stages to save the set, and the power management starts the standby.
Blackout: the emergency board’s undervoltage relay sees the voltage go. The bus tie opens, the emergency generator starts, and its breaker closes onto the dead emergency board. It’s interlocked so it can’t close while the bus tie is closed.
The 45 seconds: SOLAS wants the emergency generator started and connected automatically within 45 seconds. On most cargo ships, this one included, nothing covers the gap: it is a full blackout, emergency lights too, until the set closes on. Passenger ships and some newer cargo ships carry a battery for it. Meanwhile the standby main set starts and closes onto the dead main board, and essential motors restart in steps so they don’t all hit it at once.
Back to normal: transfer the emergency board back to the main board by hand: emergency generator breaker open, bus tie closed. Then let the emergency generator run unloaded to cool down before it stops.