ETO · Part 2 · Generation

Shore Power

Alongside for a week, the generators can rest. But the shore supply isn’t your generator: check what you’re being given, cut the load to what the cable can carry, transfer cleanly, and don’t chase the ground that comes with it.

Shore connection box and main board

The three things to check

Rotation. Every three-phase motor on board turns the way the shore’s phase sequence tells it to. Check the phase sequence indicator in the shore box before you close anything. Wrong, and you correct it at the shore box with the supply dead (or with its phase-reversal switch, if it has one), never on the main board.

Capacity. The shore breaker and cable set the limit, not the ship. Amps = kW ÷ (1.73 × volts × power factor). Shed the big loads before you transfer.

The expected ground. Most shore supplies have an grounded neutral. Your insulation monitor sees that ground and reads zero, unless the ship takes shore power through its own isolation transformer. That isn’t a fault on your ship, but while it lasts the ship is a grounded system: a first ground is a short that trips a breaker, not a lamp. You have no ground-fault warning until you go back on your own generators.

Voltage and frequency: a 50 Hz supply on a 60 Hz ship runs every motor about 17% slower, and the V/Hz is wrong for transformers and motors. That’s a decision for the chief, with restrictions, or a frequency converter on the dock.