Two sets on one bus are locked to the same frequency and voltage by the bus itself. From then on each set's governor and AVR control its share, not the bus. Raise a governor and that set takes kW from its partner; the frequency barely moves. Raise an AVR and that set takes kVAR from its partner; the voltage barely moves. Picture two people carrying a plank: the height of the plank is the frequency, and who carries more is the governor setting. Lift harder and the plank does not rise, the other person just carries less.
Synchronizing is getting the second set's hands under the plank at the same height, moving at the same speed, before letting go. Four things must match: phase sequence, fixed at installation and re-checked after any generator cable work; voltage; frequency; and phase angle, which is what the synchroscope shows. Close just before twelve o'clock with the needle drifting slowly clockwise, so the incoming set is a touch fast and picks up load instead of tripping on reverse power. The check-sync relay is there to stop you closing out of phase; prove it works after any work on the board.
On a ship with a power management system, the PMS does all of this: starts a set on load, synchronizes, shares, sheds non-essential loads when a set trips, and recovers from a blackout. You still own the inputs it works from: the PTs and their fuses, the CTs, the breaker status contacts, the control wires to governor and AVR.
Pocket rules. Unequal kW: governor. Equal kW, unequal amps: AVR and kVAR. A scope that will not move is a PT fuse before it is a scope. After any generator work, rotation first, sync second.
Electrical or mechanical. Synchroscope, check-sync, auto-sync, PMS, PTs, CTs, load-share and droop wiring: electrical. Governor mechanical: mechanical. Changing relay settings or PMS logic, or choosing isochronous over droop: only with the go-ahead. PMS firmware: vendor.