This book is for an engineer taking an ETO job for the first time: someone who already holds a license and knows the engine room, and who now owns every wire on the ship. It does not teach the trade from nothing, and it does not replace a single maker's manual. It gives you a picture of each system you are responsible for, clear enough to carry in your head, and a way of thinking that works on equipment you have never seen.
Every entry is one drawing and the words that walk it. Look at the drawing first. If you can redraw it from memory a week later, you have the entry.
The tags. An entry marked (R) is something you are responsible for: what it is, how it works, what goes wrong with it. An entry marked (F) is a job you will be asked to do with your hands: a test, a repair, a replacement. Parts 0, 1 and 8 carry few tags because they are skills and ideas you use everywhere.
The parts of an entry. Pocket rules are the few lines worth memorizing. Yours or not says where your job stops and the engineers', the Chief's or the vendor's begins; ships differ, and your Chief has the last word. Used in, in Part 1, lists the entries where that piece of theory comes back. Each equipment Part ends with a how it breaks entry that sorts symptoms to causes, and Part 8 collects the method behind all of them.
Where to start. If you join a ship next week, read Part 0 and Part 8, then work through Part 9 on your own ship. If something is broken in front of you, start at the symptom index at the back. Read the rest as the equipment in front of you calls for it. A number in brackets, such as (3.7), points to another entry.
What the drawings are. Every drawing here was made for this book. Several are redrawn from real ships' sheets, and say so, to show what the real thing looks like once the idea is clear. None of them is your ship. Your ship's own drawings, the maker's manual and the safety management system are the authority, and where they disagree with this book, they win.
The numbers. You will hear 440, 450 and 480 used for the same system, sometimes in one sentence. They are one system. The generators make 450 V, the motors and gear on the end of the cables are rated 440 V, and 480 is the shore name for the same class of system, where the motors are rated 460 V. This book says 450 V at the generators and the bus, 440 V for the system and its motors, and 220 V for lighting and hotel loads. When the exact figure matters, read the nameplate. On a 400 V or 690 V ship the ideas are the same and the numbers scale.
A word on safety. Much of this book is about live equipment at 450 V and above. Nothing in it replaces lockout, proving dead with a meter you have just proved, the permit system, or the judgment to stop. Read 1.16 before any of the repair entries.