Slide the drawing sideways, or open it full size.
With the circuit running, put the meter across any closed contact, lug, fuse or splice. A good one drops almost nothing, a tenth of a volt or less; a bad one drops volts, and those volts are missing from the load and turning into heat in the connection. It finds the failing contactor before it welds, the hot lug before it smokes, the corroded splice behind a dim light, without taking anything apart. Learn to do it on every panel you open while it is live and safe to do so, and you will find faults before they are faults.
Pocket rule. Across a closed contact under load: near zero is good, volts is going bad.