Source live, load dead, something in between is open. Read at the middle. Volts there means the open is beyond; no volts means it is before. Go to the middle of the half that is left and read again. Each reading halves the problem, so sixteen points take four readings and sixty-four take six. Walking from the source works on a six-point starter rung; it does not work on a forty-device fire loop or a nav light circuit that climbs the mast. The middle is wherever you can get a meter on: a junction box, a terminal strip, a connector. Pull the drawing, mark the boxes you can reach, and those are the test points.
Pocket rule. Never test the next device; test the middle of what is left.