Clamp meter. Around one conductor at a time; around all three the fields cancel and it reads zero. Reads running current without breaking the circuit; a true-RMS clamp reads honestly on drive outputs, a cheap one does not. Inrush mode catches the start. A leakage-rated clamp around all three conductors of a motor cable reads the ground leakage, and that is the fastest way to find which feeder carries a ground without opening a breaker.
Megger. 500 V for 440 V machines and cables, 1000 V for the switchboard bus. Control and electronics circuits don't get meggered: the test voltage tells you nothing there and can kill a card. Check them with a multimeter on ohms. Reading at one minute, and a polarization index (ten-minute reading over one-minute) when a big machine is in question. Discharge the winding afterward; a megger leaves a charge.
Phase rotation meter. Three leads, one arrow. After any generator cable work, before the first sync, and at every shore connection. Also at a motor to confirm which way it will turn before you couple it.
Proving unit and non-contact tester. The non-contact pen finds live conductors fast and lies often. The proving unit is a pocket source that proves the pen, or the meter, is working before and after you trust it to say something is dead. Carry both.
Pocket rules. One conductor in the clamp. Megger voltage to match the circuit; electronics get a multimeter, not a megger. Rotation before you sync or couple. Prove the tester, test, prove the tester.