The big breakers on the generator and bus-tie cubicles are the one piece of switchgear where a mistake is not a nuisance but a casualty, and they are also the piece most new ETOs have never had apart. Here is what is inside.
The pieces. Main contacts carry the current; arcing contacts take the arc when they open so the mains stay clean; arc chutes above them stretch and cool the arc. The closing spring is charged by a motor (or by hand) and released by the closing coil; the breaker closes from the spring, not from the coil, which is why a charged spring is stored energy. The shunt trip opens the breaker when a relay sends it a pulse. The undervoltage trip, the UVT, is a coil that must be held energized for the breaker to stay closed: lose its supply and the breaker opens, which is how a blackout drops every feeder that has one, and how the generator breaker drops when the set dies. The trip unit watches current and times the overcurrent trip. The auxiliary block carries the contacts that tell the board, the PMS and the alarm system what the breaker is doing. The racking mechanism moves the whole breaker in and out of the cubicle: connected on the bus, test (isolated from the bus but with control plugs connected, so you can operate it dead), and disconnected.
The interlocks. Mechanical: you cannot rack a closed breaker, you cannot close a breaker between positions, and the shutters drop over the bus stabs when the breaker comes out. Electrical: generator breakers will not close out of sync, the shore breaker will not close with a generator on, the emergency board's tie and generator breaker will not close together, and the bus tie may have its own rules. Every one of these exists because somebody once did the thing it prevents. Read the board's interlock diagram until you can list them from memory.
The UVT, because it fails most. The UVT coil runs hot all its life, and its supply comes through a contact or a relay that also lives a hard life. When it fails you see one of two things: a breaker that will not close (it closes and immediately trips, or will not latch) because the UVT is not held, or a breaker that trips for no reason because the UVT supply blinked. Check the supply at the UVT terminals before you blame the coil; check the coil's resistance against the manual before you blame the breaker. Some UVTs have a time delay so a short dip does not trip the feeder; know whether yours does.
Racking out safely. Open the breaker. Discharge the closing spring and read the indicator: DISCHARGED. Rack from connected to test and confirm the position indicator; now you can operate it electrically with nothing on the bus to prove the close and trip circuits. Rack to disconnected, confirm the shutters are down, and lock out the cubicle. Only then does it come out onto its trolley.
Maintenance, even just cleaning. With the breaker out: vacuum, never blow, so the carbon dust does not go into the mechanism. Inspect the arc chutes for cracks and burning and the arcing contacts for wear against the manual's limit; measure the main contact wear indicator. Lubricate only the points the manual names, with the grease it names; the wrong grease hardens and the breaker closes slow. Exercise it a dozen times open and closed in the test position. Test the UVT by dropping its supply and the shunt trip by pulsing it. Check the secondary plug and the aux contacts. Torque the cluster contacts' bolts if the manual allows it. Write down what you found.
High voltage. On a 6.6 kV board the breakers are vacuum bottles in the same frame, and all of the above applies with three additions: an grounding switch to ground the feeder before anyone touches it, live-line indicators you check and a detector you prove, and a permit system you follow without shortcuts. HV is where the ETO's job stops being an electrician's job, and the difference is procedure, not cleverness.
Pocket rules. Open, discharge, read the indicator, then rack. Test position is where you prove the circuits. UVT: supply first, coil second. Vacuum, don't blow. Only the manual's grease, only where it says.
Yours or not. Racking, cleaning, inspection, UVT and shunt trip testing, aux contacts, trip unit test: yours. Contact replacement, mechanism overhaul, trip unit calibration, anything on the HV board beyond operation and inspection: vendor on a schedule, with you watching and learning.