One relay watches the emergency bus. When the bus dies, the relay starts the set and closes its breaker, and that chain has to work within 45 seconds without a person touching it. Everything you do with this machine is about proving the chain is alive.
The set is small, a hundred to five hundred kilowatts, in its own room above the uppermost continuous deck with its own fuel, usually radiator cooled. It needs two independent ways to start. SOLAS (II-1/44) asks for stored energy for at least three starts in a row, and a second source good for three more within 30 minutes unless a hand start is shown to work. On the ship that means two battery banks with their own chargers, or batteries plus a hydraulic accumulator, a spring starter or an air receiver. There is a jacket heater so it starts warm, a space heater on the alternator, and a battery charger that is quietly the most important thing in the room.
In normal running the emergency board is fed from the main board through the tie. The emergency board carries what the ship cannot lose: emergency lighting, one steering motor, the emergency fire pump, fire detection, GMDSS and navigation gear, watertight door hydraulics where fitted, the chargers. Until the set closes on, a blackout is a full blackout on most cargo ships, and on every ship in the older US fleet. Passenger ships, and some newer cargo ships, also carry a battery source that keeps the emergency lights on through the gap. When main power returns, the sequence runs backward, on a timer, by hand, or through a brief parallel on boards that have a synchronizer fitted. The two breakers are interlocked so both cannot be closed unless that synchronizer exists and is in use.
Pocket rules. A running set with an open breaker is a running set, not an emergency generator. The relay has three jobs; prove each one separately. The hour you spend in that room on day one is the best hour of the hitch.
Electrical or mechanical. Batteries, chargers, auto-start logic, undervoltage relay, breaker, interlocks, heaters, alternator and AVR, the test log: electrical. Engine, fuel and coolant: mechanical. The load test and the blackout test: scheduled with the engineer in charge.