Load test. On the ship's schedule, and often with the mate who keeps the radio log: open the main and emergency supplies to the radio station so it is on the reserve battery, run the station for the required period, log the battery voltage at the start, during and at the end, then restore and confirm the charger is charging. A bank that falls faster than the log says it did last time is aging.
Change. Same type, same capacity, same number of blocks. Mark the cables, take the charger off the battery first (its breaker or fuse) so the charger carries the sets while the battery is out, change both blocks of a series pair together (where there are two strings in parallel, one string at a time), clean and grease the terminals, torque, reconnect the charger and check its float voltage matches the new battery's requirement. Date the new blocks with a marker. Dispose of the old ones properly.
The routine checks. The mates usually do these, as often as the ship's schedule says; know what they cover, because the faults they find come to you: battery on-load voltage and specific gravity if they are open cells, charger current and float voltage, the changeover from main to emergency to reserve, antenna insulators and tuner housings looked at for water.
Pocket rules. Test on battery, not just measure it. Like for like. Charger off the battery first, back on last. Date the blocks. Insulators and tuners for water.