The switchboard does not control itself from the bus it controls, because on a blackout the bus is dead and the breakers still have to be tripped and closed. So the board has a DC supply, typically 110 V on bigger ships, with a battery and a charger, for trip coils, closing coils, indication and the protective relays. Separately, the alarm and monitoring system, the engine safety system and most of the automation run on 24 V DC, also battery-backed. These two small systems are the nervous system of the plant, and when they fail, the plant can be perfectly healthy and completely blind.
Each has a charger that normally carries the load with the battery floating, and a battery that carries it when the charger or the AC supply is lost. A charger failure shows up days later as a low battery alarm, or on the day of the blackout as nothing working.
Pocket rules. Control power is the first thing to check when everything on a panel is dead at once. Read the charger ammeter: a charger carrying no load with a battery that should be floating is a charger that has quit. Know where the control power fuses are on every board.
Electrical or mechanical. All electrical.