Part I · The Plants

Refrigeration and HVAC

One vapor-compression cycle keeps the provisions frozen, the accommodation cool, and the control room electronics inside their limits. The same four parts appear in every unit on the ship; what changes is the size and the box temperature.

Lessons and simulators

Lessons teach one thing step by step. Simulators are free play: best after the lesson.

LessonReefer Receptacles and the Monitoring SystemThe ship’s side of the reefers: the feeder to forty receptacles, the load on loading day, plugging in and out without burning pins, a rain ground found receptacle by receptacle, and the office screen read right.LessonRefrigeration and HVAC: A Motor and a Chain of SafetiesThe provision plant’s compressor rung opened one safety at a time; the wiring or the card; an HP trip read before the reset, an LP short-cycle settled at the sight glass, an iced coil traced to its timer.LessonHVAC and Provision Plant RepairsFour repairs on Hawsepiper’s cooling: a part-winding compressor’s two contactors, a pressure switch isolated at its service valves and set by the gauge, a fan motor matched and turned the right way, a controller rewired and typed.LessonHow Hotel Systems BreakPart 7 round-up on Hawsepiper: sort eight calls into water, heat, vibration and neglect; then a UPS alarm, a fire panel fault, a tripping galley GFCI and a machine you have never seen.LessonPlant Tour: Refrigeration and HVACWalk Hawsepiper’s provision plant and air conditioning stop by stop on one drawing of the aft end, from the compressor round the cycle to the meat, veg and dairy rooms, then the AHU and the engine room supply fans: what to look at, what normal reads, a call at each stop; then six sets of readings.Simulator · free playGauges to DiagnosisTurn refrigeration gauge and thermometer readings into superheat, subcooling and a ranked list of likely faults.Simulator · free playProvision PlantRun a ship's provision refrigeration plant with three rooms, pump-down control and a live control ladder, then diagnose eight common faults.

What kills it

Normal numbers

Maker’s values override these.

PointTypical
Suction — R-404A provision plant, freezer rooms0.5–1.5 bar g
Suction — R-404A provision plant, cold rooms2.5–4 bar g
Discharge — R-404A, water-cooled condenser14–20 bar g
Suction / discharge — R-134a AC plant2–3.5 / 8–12 bar g
Compressor discharge temperature60–90 °C; alarm 110–120 °C
Superheat at evaporator outlet5–10 K
Subcooling at condenser outlet3–8 K
Condensing temp above cooling water outlet5–10 K
Meat and fish rooms−18 to −22 °C
Dairy / cold store+2 to +4 °C
Vegetable and fruit room+4 to +8 °C
Freezer defrost2–4 per day; ends at coil 10–15 °C
Chilled water supply / return6–8 °C / 11–13 °C
AHU supply air12–16 °C

The tour

The plant, stop by stop, as the book walks it.

Reading the gauges

Each one is a set of readings. Decide what they mean and what you’d check first, then look.

Symptoms

SymptomCheck firstLikely causesAction
Box warm, compressor running continuouslyOpen the room: coil, fansIced coil; fan stopped; low charge; TXV starved; doorManual defrost; check charge and superheat
Box warm, compressor stoppedWhich cutout trippedHP, LP, oil, or overload trip; thermostat; solenoid coilFind the cause before reset
Compressor short-cycling on LPReceiver level, sight glassLow charge — leak; solenoid passing; LP settingLeak search; valve check; reset differential
Trips on HPCooling water in/out tempsWater flow or temp; fouled tubes; air; overchargeRestore water; brush tubes; purge
Suction line frosted to the compressorFans; superheatTXV overfeeding; fan stopped; bulb looseFix fan; bulb; superheat setting
Bubbles in the sight glassSubcooling; drier temperatureLow charge; blocked drier; liquid line heat gainCharge only if subcooling is low; change drier
Moisture indicator wetFreezer TXV for iceMoisture — low-side leak, wet chargingChange drier; evacuate if it stays wet
Oil level low or foaming, low oil pressure on startCrankcase heaterRefrigerant in oil — heater off or not on long enough; oil trapped in system6 hours of heater before a start; run and watch for return
Supply air warm, chilled water warmCompressor loading; headPlant capacity; condenser; charge; loadCondenser; charge; shed fresh air
One deck hot, others fineThat zone's dampersDamper moved; fire damper shut; reheater onReset dampers; check reheater
ECR AC trips on HP during maneuveringLT temperature; LT cooler ΔPLT cooler strainer foulingSwitch coolers; reset; clean the offline strainer now
AC and provision plants stopped after a blackoutSequential restart listNot on the automatic restartRestart by hand; post the list in the ECR

Scenarios

Work out what you’d do, then open it.

meat room creeping

The meat room has gone from −20 °C to −15 °C over a week. The compressor runs longer every day. No alarms yet. What's happening and how do you find it?

Slow is the clue: nothing has failed outright. Check the receiver level against last week's entry; a drop says leak. If the level is steady, open the room: a coil icing a little more each cycle means a defrost running short — termination thermostat ending early, or one heater element gone so the rest can't finish. A condenser fouling slowly shows as head pressure creeping up each day. The log number that moved tells you where to look.

ECR AC trips during maneuvering

Arrival maneuvering, and the engine control room AC trips on high pressure. You reset it; it trips again twenty minutes later. What's the connection?

The AC condenser is on the LT central cooling loop. Maneuvering changes the load, and a fouling LT cooler strainer cuts the flow until the warmer LT water pushes the AC head over its cutout. Check the LT cooler ΔP, switch to the other cooler, and reset the AC. Then clean the offline strainer right away — don't wait until the second cooler clogs to clean the first.

blackout at sea

The standby generator recovers the bus after a blackout. The vital pumps restart on sequence. Two hours later the cook reports the freezer is warming and the accommodation is hot. What happened?

The AHU fan, the AC compressors, and the provision compressor aren't on the sequential restart; they sat stopped while everyone dealt with the main engine. Restart them by hand — AC first for the control room and switchboard spaces, then provisions. A freezer with its doors shut holds for hours, so the loss is small this time. Write your ship's manual restart list and post it in the ECR so the next blackout includes them.

Dependencies

Needs
  • Electrical — compressors, fans, pumps, defrost heaters, crankcase heaters, controls
  • LT freshwater or seawater — condensers and chillers (Seawater and Central Cooling)
  • Steam or electrical heat — AHU reheaters where fitted
Feeds
  • Provisions — freezer and cold rooms
  • Habitability — accommodation air conditioning
  • Engine control room, switchboard rooms, bridge electronics — equipment with temperature limits
  • Galley cold storage and ice

Draft: this page is drawn from the book manuscript and is still being checked.