Batteries carry the services that must survive losing the board — emergency generator start, general alarm, radio, emergency lighting, and the automation and navigation fed through a UPS — and a charger keeps them full. A charger holds the bus voltage up whether or not there is a live battery behind it, so the only way to know what you have is to take the charger away and look.
Lessons teach one thing step by step. Simulators are free play: best after the lesson.
Maker’s values override these.
| Point | Typical |
|---|---|
| Lead-acid float, per cell | 2.20–2.30 V flooded; 2.25–2.30 V VRLA, compensated down as it gets hotter (a 24 V bank of 12 cells: about 26.4–27.6 V) |
| Lead-acid boost or equalize, per cell | 2.35–2.45 V, timed, then back to float |
| Lead-acid rested open-circuit, full | 2.10–2.13 V per cell; a 12 V block 12.6–12.8 V |
| Specific gravity, flooded lead-acid, full | 1.250–1.280 at 25 °C; some makers use 1.215–1.240; discharged near 1.150; add 0.004 per 6 °C above reference |
| SG spread across cells | within 0.020–0.030; one cell further out is the bad cell |
| NiCd float / boost, per cell | 1.40–1.45 V / 1.55–1.70 V; nominal 1.2 V |
| Charger ammeter at float | near zero: standing DC load plus a trickle |
| UPS runtime | per maker, commonly 15–60 min at rated load; the display estimate assumes healthy batteries |
| GMDSS reserve battery | 1 hour with an emergency generator fitted, 6 hours without |
Each one is a set of readings. Decide what they mean and what you’d check first, then look.
| Symptom | Check first | Likely causes | Action |
|---|---|---|---|
| Charger volts normal; battery voltage collapses with the charger off | Voltage per block or cell | Dead or sulfated bank; open cell | Find the bad block; other bank; replace |
| Charger ammeter high at float and never falls | Bank temperature; levels | Shorted cell; thermal runaway on VRLA; float set high | Per-block voltage; isolate a hot bank |
| Charger output zero, DC bus low | Charger AC supply, breaker, fuses | Supply lost; charger failed; DC fuse | Restore — the bank is discharging now |
| One cell SG 0.030 or more below the rest | Its level and voltage | Weak or shorted cell | One equalize; still low — replace it |
| Crust on terminals; voltage drop under load | Terminals | Acid mist; loose joint | Isolate, clean, retorque, grease |
| Emergency generator cranks slowly or not at all; bank reads normal at rest | Voltage during cranking; terminals | High-resistance joint; weak bank; cold | Clean and tighten; other bank; spring starter |
| UPS ON BATTERY with the board live | UPS input breaker, input volts and Hz | Input out of tolerance; input fuse; rectifier fault | Fix the input — it is discharging |
| UPS "replace battery" alarm, runs fine on AC power | Battery date; self-test log | String failed its self-test | Replace before you need it |
| UPS on BYPASS, nobody knows why | Event log | Overload transferred it; inverter fault; left after service | Find the cause; return to NORMAL |
| Bank hot, hard gassing, rotten-egg smell, levels dropping | Charger mode and voltage | Boost stuck on; regulator failed; shorted cell | Charger to float or off; ventilate; top up after |
Draft: this page is drawn from the book manuscript and is still being checked.