Transformers step the 440 V bus down to 220 V or 120 V for lighting and small power, isolate shore power and sensitive loads from the ship's system, and scale current and voltage down so meters and relays can read them. With no moving parts, almost everything that goes wrong is heat, moisture, or a loose connection.
Lessons teach one thing step by step. Simulators are free play: best after the lesson.
Maker’s values override these.
| Point | Typical |
|---|---|
| Lighting transformer ratio | 440 → 220 V (230 or 115/120 V on some ships); three-phase, dry type |
| Rating | tens to a few hundred kVA each; two in parallel or one duty, one standby |
| Secondary voltage, no load to full load | falls 2–4 %; taps correct it |
| Taps | on the primary, changed dead; ±2.5 % and ±5 % are common |
| Insulation class | F (155 °C) or H (180 °C); winding rise per nameplate |
| Cooling | AN (natural air through louvers) or AF (fan started by winding temperature) |
| Hum | steady, at twice line frequency; a change of pitch or a rattle is the fault |
| Phase current balance | within 10–15 % of each other |
| Insulation resistance | 500 V DC on the 440 V side, 250 V on the 220 V side; 1 MΩ floor, healthy reads tens to hundreds of MΩ; trend it |
| Magnetizing inrush | 8–12 × full-load current for a few cycles on energizing |
| CT secondary | 5 A (or 1 A) at rated primary current |
| VT secondary | 110 or 120 V at rated primary voltage |
| Parallel operation | same ratio, same vector group, same tap; impedance within about 10 % |
Each one is a set of readings. Decide what they mean and what you’d check first, then look.
| Symptom | Check first | Likely causes | Action |
|---|---|---|---|
| Secondary volts low, primary normal, lights dim at peak load | Tap position; secondary amps | Regulation under heavy load; tap one step low | Shed or rebalance; retap one step, dead, on all parallel units |
| Secondary volts high, lamps burning out | Tap; primary volts | Tap left high after replacement; generator AVR set high | Set tap; see Generators and AVRs |
| Hotter than usual at the same load | Louvers; fan; room temperature | Blocked ventilation; fan failed; hot ER | Clear, repair, shift load to the other unit |
| One phase hotter, one phase amps high | Load split; terminal scan | Single-phase loads unbalanced after a refit; loose terminal on that phase | Move circuits between phases; retorque dead |
| Hum louder or changed; rattle | Bus volts and Hz; clamp bolts; panels | Overvoltage; loose core clamps or enclosure panel | Correct volts; tighten dead |
| Feeder breaker trips the instant it is energized | Trip type on the breaker | Magnetizing inrush on an instantaneous setting; genuine short | Megger first; clean and trips again — instantaneous set too low for inrush |
| 220 V ground lamp dim on one phase | 220 V loads one at a time | Ground on a lighting circuit; winding to core | Find the circuit; megger the transformer if nothing else clears it |
| Megger down from last reading | Room humidity; dust and salt on windings | Moisture; dirt; oil mist | Clean, dry out, retest |
| Feeder ammeter reads zero, motor running | Meter selector; CT shorting links | Links left in after work; meter or selector dead | Do not lift a wire on a live CT loop — isolate first |
| Voltmeter zero on one phase, bus live | VT secondary fuses | Fuse blown | Replace; check what relays saw |
| Two parallel units: current flowing at no load, both warm | Tap positions on each | Tap or vector group mismatch — circulating current | Match taps; confirm vector groups |
Draft: this page is drawn from the book manuscript and is still being checked.