A tank holds a liquid where you can find it again, breathes as the level changes, and tells you how much is in it. The sounding tape is the only instrument aboard that answers how much directly; everything else is a trend.
Lessons teach one thing step by step. Simulators are free play: best after the lesson.
Maker’s values override these.
| Point | Typical |
|---|---|
| Sounding pipe bore | 32–50 mm |
| Air pipe height above deck | 760 mm freeboard deck · 450 mm superstructure deck |
| Remote gauge (TLI) on an empty storage tank | 3–7 m³ dead band — record yours |
| Bunker fill limit | 85–90 % of capacity, by company rule |
| Trim correction columns | 0.5 or 1 m steps, usually to 3–4 m by the stern |
| Residual fuel volume change | about 0.06–0.07 % per °C |
| Steam to heating coils | 4–8 bar reduced; condensate back through traps |
| Sludge and oily bilge tank for discharge | 40–50 °C |
| Pump-down limit, heated dirty tanks | 15–25 cm — below that the pump loses suction on sediment |
| Tank being filled | sounded every 15–30 min by tape |
Each one is a set of readings. Decide what they mean and what you’d check first, then look.
| Symptom | Check first | Likely causes | Action |
|---|---|---|---|
| TLI reads several m³, tape says empty | Empty-tank record | Dead band; trim; sludge at the dip tube | Report the sounding; record the dead band |
| TLI and local gauge climb fast at bunkering | Tank vent | Float stuck; gauze blocked; filling faster than the vent | Slow the fill; clear the vent |
| Sounding up on a tank nobody filled | Kick for water; make-up feed | Coil leak; fill or crossover valve passing; bulkhead leak | Isolate the coil; prove valves one at a time |
| Water at the kick mid-transfer | Source tank | Overflow tank sent unsounded; coil leak; wet bunker | Stop transfer and purifier; call the engineer in charge |
| Tape hangs up, reads short | Pipe on the plan; pipe bore | Bent pipe; treatment chemical congealed in the pipe | Ullage; flush with diesel; dose with diesel behind |
| Tape goes past the reference height | Striking plate | Plate corroded through | Stop using that pipe; report; inspect at entry |
| Soundings and flow meter disagree | Temperatures; trim; overflow returns | No temperature correction; returns counted twice; meter drift | Recalculate; reconcile with the engineer in charge |
| Tank holds less than the table | Sediment depth at last opening | Mud or sludge; blocked limber holes | Note working capacity; clean at next opening |
| Transfer pump at full vacuum, strainer clean | Vent; valve at its override; tank temperature | Vent blocked; valve not open; cold fuel | Clear vent; prove valve; heat the tank |
| Small tank overflowed | Auto-stop float | Float stuck; operator left; overflow routed to storage | Test the auto-stop; stay with every fill |
| Two tanks equalizing | Suction and crossover lineup | Two suctions on a common line | One suction at a time; close at the tank |
| Oil in observation tank or hotwell | Heating lineup | Holed coil or fuel heater tube | Isolate coils one at a time; blank; pads in the hotwell |
| Potable tank gauge disagrees with tape | Suction lineup; gauge glass fittings | Gauge fault; two suctions open | Report soundings; close one suction |
Draft: this page is drawn from the book manuscript and is still being checked.