The main switchboard joins the generators to the bus and the bus to every feeder, and its breakers and relays decide what gets disconnected when something goes wrong. Reading a trip correctly, resetting it safely, and racking a breaker are Stage 1; relay settings and discrimination are Stage 4 and are marked where they come up.

protection detail: Stage 4

Lessons and simulators

Lessons teach one thing step by step. Simulators are free play: best after the lesson.

LessonBus Tie and Rack-Out BreakersWhat a bus tie is for, every part inside an air circuit breaker, how it closes and trips, racking it out safely, and finding out why it won't close.LessonSynchronizing and Load SharingPut No. 2 generator on the board: match voltage and frequency, close just before 12 on the synchroscope, share the kW with the governors and the kVAR with the AVRs, fix a backward droop CT, and sort six sets that won’t share.LessonGround Lamps and the Ground HuntRead the three ground lamps and the insulation monitor, name the island a ground is on, half-split the board down to a wet deck light, and find a ground on a feeder that can’t be dropped with the leakage clamp.LessonThe Emergency Generator ChainWatch the undervoltage relay open the tie, start the 250 kW set and close its breaker inside 45 seconds; sort the emergency board’s loads; check cranking volts; run the real test with the tie open and the load on; and name six quiet failures.LessonShore PowerProve rotation and fix it at the shore end, judge four berths’ volts and hertz, fit the load under a 400 A pier breaker, change over through a blackout, see why a ground trips on shore power, and find a warm lug.LessonProtective Relays: Read the FlagWhat each of the five generator relays watches; a reverse power trip after a slow close; overcurrent that rides through a motor start; the AVR’s relays against the governor’s; differential and its zone; a multifunction relay’s event log; and six trips to sort.LessonThe Main Board One-LineWhat each feeder on the main board protects, what else just lost power, inside a feeder cubicle, a crane feeder trip walked down to a wet junction box, why an open tie proves nothing, and six calls.LessonTransformers and the 220 V SideTwo transformer banks on two halves of the board and the interlocked changeover, half the volts and twice the amps, why a 220 V ground never shows on the 440 V lamps, a hot transformer checked in order, taking a bank out of service, and six calls.LessonControl Power: 110 V and 24 V DCThe board’s own 110 V DC supply and the automation’s 24 V: chargers and batteries through a blackout, reading the charger and battery ammeters, a charger that quit two days before anyone noticed, a blown control fuse, and six calls.LessonPreferential Trip and Load SheddingSort the feeders into stages and the never-shed list, watch a set trip and the board shed load to save the last set, the blackout without it, capacity before putting the load back, and why a set over its share can shed the galley.WorksheetYour Own One-LineWorksheet. Walk M/V Hawsepiper’s two switchboards door by door, check your sheet against the yard one-line, settle each difference at the door, mark the halves, then fill in and print the sheet for your own ship.WorksheetThe Islands and the Control PowerWorksheet. Walk M/V Hawsepiper’s ground lamps and insulation monitors, AC and DC, and note today’s readings; answer four ground alarms from the sheet; fill in the four control supplies; find the dark panel’s fuse. Then fill in and print your own.WorksheetThe 45 SecondsWorksheet. Build M/V Hawsepiper’s blackout timeline from the moment the bus dies: the relay, the interconnector, the start, the bank, the breaker at 13 s. Sort what comes back by itself, then the standby set and the sequential restart, and the steering pump that didn’t come back. Then fill in and print your own.LessonStored Energy and Arc Flash: Where It HidesFour places energy stays after the breaker opens: an ACB’s closing spring, a drive’s DC bus, a pump turned by back-flow, a battery bank. Then the arc-flash label on the main board.LessonReading the Switchboard Like a StoryFive meters on each generator panel and the stories they tell: equal kW with unequal amps, unequal kW at the right frequency, a plant near its limit, poor power factor, low volts on every set.LessonDC Grounds: Floating or Chassis-GroundedFloating 110 V and 24 V with + and − lamps, and the EDG engine’s 24 V with its negative on the block: pull breakers, split at junction boxes, meter across the device, hunt a short.LessonReplace a Breaker, Fuse, Relay or TerminalThe five things on a breaker label, a galley breaker swapped with the feeder above locked out; three fuses matched by type, rating and speed; MAC1’s trip relay matched by coil and contacts; a hot terminal.LessonLighting: Ballasts, LED Drivers and Wet FittingsInside a fluorescent, an LED and an incandescent fitting and which part fails; four purifier room fluorescents; two dead LED floods on the bench; 120 LED drivers that look like a ground; four wet deck floods.LessonCables, Glands, Penetrations and the Cable NumberRead a marine cable inside out and a tag against the cable list, find what people did to a tray, judge five glands on a wet deck box, and find the hole a contractor left in an A-60 transit.LessonMake Up a Cable End and GlandA deck box that filled with water through its gland: find the six faults in the old end, then make up the new one. Strip to the gland, braid into the cone, tighten and pull, ferrule, number, slack.LessonRepair a 440 V Motor Cable: The Three-Tape MethodNo. 1 LT pump’s lead cracked at the gland: prove it dead at the motor, find the core, clean it, rubber twice and vinyl over, megger it, fix the gland. Then cooked leads in FOP2’s box.LessonHow Distribution BreaksPart 3 in one sitting: eight distribution symptoms sorted to their first check, then three walked on M/V Hawsepiper: a trip with nothing changed, a trip every start, and lights that dim and stay dim.LessonReefer Receptacles and the Monitoring SystemThe ship’s side of the reefers: the feeder to forty receptacles, the load on loading day, plugging in and out without burning pins, a rain ground found receptacle by receptacle, and the office screen read right.LessonAC and Three-Phase: What the Meter Is Telling YouDG2 at 59.3 Hz is an engine running slow. RMS and peak, true-RMS against average-responding on a UPS feed and a drive output, the voltmeter selector, and wye and delta windings.LessonkW, kVAR, kVA and Power FactorThe meter-in-hand theory under the generator panel: two plates on DG1, SWP1’s triangle from a clamp and a voltmeter, a motor running light, a set at its ammeter limit with kW to spare, two sets not sharing kVAR.LessonPlant Tour: The Electrical PlantWalk Hawsepiper’s electrical plant stop by stop on one drawing of the engine room and the accommodation above it, from the emergency generator to the shore connection: what to look at, what normal reads, a call at each stop; then six sets of readings.Simulator · free playSwitchboard MeterskW, kVAR, kVA, amps and power factor on the generator panel: build the load and watch the power triangle, then read two paralleled generators and fix uneven kW and kVAR sharing.Simulator · free playGenerator ProtectionRead the trend before a generator trip and name the protection that operated, then set a generator breaker’s overcurrent curve so it rides through a motor start but still discriminates with the feeders.Simulator · free playBreaker Won't CloseAn air circuit breaker that won't close: read its flags, measure its coils and find which of eight interlocks or faults is stopping it. Then rack one out in the right order.

What kills it

Normal numbers

Maker’s values override these.

PointTypical
Bus voltage / frequency440–450 V, 60 Hz; limits in Electrical Plant, At a Glance
ACB positionsCONNECTED · TEST · DISCONNECTED (some add REMOVED)
Closing springsrecharged by motor within seconds of each close; flag shows CHARGED
Undervoltage releaseopens the breaker between 70 % and 35 % of rated; allows closing at 85 % or more
Shunt trip coiltrips anywhere from 70–110 % of control voltage
Check-synchronizing windowvoltage within 5–10 %, slip under 0.1–0.3 Hz, phase within 10–20°
Preferential trippicks up near 100–110 % of a set's rating; stages a few seconds apart
MCCB handleON · TRIPPED (mid-position) · OFF/RESET
Insulation monitor alarmper maker and class; commonly tens to low hundreds of kΩ
Terminal hot spot4 °C or more above matching joints at the same load — investigate; over 15 °C, repair now

Reading the gauges

Each one is a set of readings. Decide what they mean and what you’d check first, then look.

Symptoms

SymptomCheck firstLikely causesAction
ACB won't close, no trip showingSpring flag; position; incoming voltageSprings not charged; not fully CONNECTED; UVR not energized; mechanical reset not pushed; interlock; control fuseWork through in that order
ACB closes and opens at onceRelay and trip unit displayFault still present; UVR not picked up; trip signal standingRead the flag; clear the cause
Generator ACB won't close on auto-sync, closes by handIncoming Hz and volts vs busSync window not reached; auto-synchronizer governor trim faultBring the set slightly fast by hand, back to auto
Generator ACB tripped, relay flag shownThe flagSee protection tableRecord, fix cause, reset relay, reset breaker, close once
ACB opened, no relay flagWhat else happened at that momentUVR drop on a voltage dip or control supply; shunt trip from an engine shutdown, emergency stop, or preferential tripFind the signal source before re-closing
Feeder MCCB handle at mid-positionThe loadOverload; motor fault; shortOFF, then ON, once; trips again — megger before more
Feeder and generator breaker tripped on one faultWhich feederDiscrimination failure (Stage 4)Isolate the feeder; restore the bus; report
Non-essential groups dead after a set trippedPreferential trip indicatorsPreferential trip operatedRestore groups one at a time, kW meter in view
Racking handle won't insert or won't turnBreaker ON/OFF; padlocks; position lockBreaker closed; padlock or key interlock; position lever not releasedOpen breaker, release interlock — never force it
Insulation monitor reads infinite or off-scale highMonitor power and selection; test buttonMonitor switched out with bus-tie; monitor dead; disconnectedConfirm one monitor in service per connected system
Ground alarm the moment shore power closesShore supply typeGrounded shore neutral, no isolation transformer; ground in shore cableLog it if normal for that berth; megger the cable if not
Warm panel door, smell, discolored terminalFeeder amps; thermal scanLoose or oxidized joint; overloaded feederReduce load; plan a dead-board retorque
Emergency board dead, emergency generator runningIts voltage; interconnector positionVoltage not built; interconnector still closed; ACB not reset after testClose manually at nominal V and Hz