The steam plant heats the heavy fuel so the engines can burn it, and heats the tanks, purifiers, jacket water, accommodation, and galley. At sea the exhaust gas boiler (EGB) makes the steam for free; in port and at low load the oil-fired auxiliary boiler takes over.
Lessons teach one thing step by step. Simulators are free play: best after the lesson.
Maker’s values override these.
| Point | Typical |
|---|---|
| Steam pressure, heating plant | 6–9 bar (some ships up to 16) |
| Burner fuel pressure, pressure jet | 15–25 bar |
| HFO temperature at burner | 115–130 °C, by grade |
| Exhaust temperature before EGB | 250–350 °C |
| Exhaust temperature after EGB | 180–250 °C; not below 160 |
| Hotwell temperature | 80–90 °C |
| Boiler water pH | 10.5–11.5 |
| P-alkalinity | 100–300 ppm as CaCO₃ |
| Phosphate (phosphate programs) | 15–50 ppm |
| Chlorides, boiler water | < 200–300 ppm |
| Chlorides, condensate and makeup | < 10 ppm |
| Hardness | 0 (< 2 ppm) |
| Hydrazine · or sulfite | 0.1–0.2 ppm · 20–50 ppm |
| Trap outlet below steam temperature | 5–20 °C |
The plant, stop by stop, as the book walks it.
Each one is a set of readings. Decide what they mean and what you’d check first, then look.
| Symptom | Check first | Likely causes | Action |
|---|---|---|---|
| Drum level swinging | Both glasses; TDS; observation tank | Regulator hunting; foaming from TDS, oil, or treatment solids | Surface blowdown; check for oil; regulator to manual |
| Level falling under steady load, feed running | Blowdown valves; feed check; hotwell | Blowdown passing; tube leak; pump not delivering | Shut blowdown; standby pump; look for steam at the stack |
| Low water alarm | Glass; feed pump; hotwell | Pump vapor-bound; regulator failed closed; blowdown open | Burner off; feed by hand if the glass shows water; if not, stay off until cool |
| Standby feed pump turning backwards | Its discharge check | Check valve failed | Replace the check |
| Ignition transformer keeps failing | Auto sequence; recently replaced sensors | Running in manual; sensor not configured | Fix the input; back to auto |
| EGB outlet temperature and ΔP rising | Soot blowers; circulating pump | Fouled tubes; soot fire if rising with engine stopped | Soot blow; fire — Stop 4 |
| Water hammer in a line | Drains; traps on that line | Cold line opened fast; trap stuck closed | Close, drain, warm through; change trap |
| Oil on the observation tank | FO and purifier heaters; tank coils | Heater tube or coil leak | Condensate to bilge; isolate consumers one at a time |
| Makeup use up sharply | Dump condenser drains; traps; heated tanks | Condenser bypassed; trap blowing; coil leak | Condenser in service; trap survey; sound tanks for water |
| Hotwell rising with makeup shut | Dump condenser; drain coolers | Cooling water leaking into condensate | Test condensate for inhibitor; pressure test |
| Chlorides and conductivity jump after a top-up | What went in; makeup float | Potable used as makeup; float failed | Blow down; distillate only; repair float |
| Chlorides and hardness rising together | Makeup water; drain cooler | Seawater in | Isolate; blow down; retest |
Work out what you’d do, then open it.
For months, nitrite in the cooling water won't stay up despite hard dosing. No visible leak; bacteria test negative. Boiler conductivity rises with each cooling water dose, and extra bottom blows don't help. Now the hotwell overflows daily and the boiler primes and trips on high water. What is it?
Two trends in two plants are one fault: something cooled by treated water is leaking into the condensate. On most plants that is the LT-cooled dump condenser or a drain cooler. Isolate it, pressure test the cooling side, and test the condensate for the inhibitor. Once it is replaced, both chemistries hold.
The hotwell is low and the boiler short of feed, but the distilled feed tank is full. The last watch topped up from potable and chlorides spiked. What should have been checked first?
Either the makeup float valve isn't passing — stuck or broken, a recurring fault — or the hotwell ran hot and the feed pumps are vapor-bound. Vent the pump casing first and watch the drum level respond. Then the float: open the makeup bypass from the distillate tank, not the potable valve.
A sheen at 0400. FO and purifier heaters on steam, tank coils open. What now?
Divert condensate to the bilge tank. Skim the hotwell, pads in the hotwell and observation tank, surface-blow the drum. Isolate heaters one at a time, five minutes each, watching the observation tank; then the coils. The one that stops the sheen gets its steam side blanked until a new bundle arrives. Then find out why the oil detector didn't alarm. The condensate to the bilge tank goes in the ORB.
The aux boiler trips on low-low water in port with the EGB cold. An hour before it can be refilled and fired. What stops, and in what order?
Nothing in the first minutes — heaters and coils hold heat. Within half an hour fuel at the generator heaters cools past what the controller can hold; change the generators to MDO now. Over the next hours bunker tanks cool and the transfer pump labors, purifiers stop separating, and the main engine's jacket water cools. Refilling a drained boiler takes many metric tons, so check the feed tank — and the water-mist system if it shares that suction.