Parallel the Generators

No. 1 generator is carrying the ship. Start No. 2, match it to the bus, close its breaker at the right moment, then share the load. Hold the Raise and Lower buttons like the spring-return switches on a real board.

Synchronizing panel

Sync lamps go dark when the machines are in phase

Slip–Hz
Volt diff.–%
Phase–
Bus–Hz
Bus–V
Ship's load–kW
Change ship's load
The job
  1. Start No. 2Wait for it to come up to speed and voltage.
  2. Match voltageUse No. 2's voltage switch until it is within 2% of the bus.
  3. Make it run slightly fastUse No. 2's governor until the synchroscope turns slowly clockwise, about one turn every 5 to 20 seconds.
  4. Close just before 12 o'clockClose the breaker as the pointer comes up to 12 and the lamps are dark.
  5. Share the kWRaise No. 2's governor and lower No. 1's until they carry the same load, keeping 60 Hz.
  6. Share the kVARUse the voltage switches to balance reactive load, keeping 440 V.